Key Steps for Installation of Thermal Remediation Systems

May 28, 2025 | 10:00 AM Pacific / 1:00 PM Eastern

As the design of your thermal remediation project nears completion, it is time to start planning for system installation and construction. In the 5th webinar of our six-part series, “The Nuts and Bolts of Thermal Remediation,” we will cover the key steps to ensure a successful wellfield installation and system construction program.

We will discuss what’s needed to prepare your site for safe and efficient drilling and well installation, including:

  • Utility locating
  • Clearing and abandonment
  • Rig access and sequence planning
  • Managing overhead utilities
  • Drilling inside buildings
  • Investigation Derived Waste (IDW) screening and handling
  • Oversight and logging
  • Opportunities to collect contaminant data and refine the site CSM during installation

Additionally, we will cover the essential aspects of installing the extraction and treatment systems, along with the power supply equipment. This includes materials and equipment off-loading and staging, determining equipment size and location, placing the power drop, primary transformer, and power distribution and control panels; and managing any site access challenges.

Details

Event Categories: