Drilling and Well Installation at In Situ Thermal Desorption (ISTD) Sites
Once all of the modeling, treatability studies, and design work have been completed, it’s on to the next step for TerraTherm and time to mobilize our staff, resources, and equipment to the field to install the thermal wellfield. This is an essential task that must be done precisely in order to ensure thermal success. It does not matter how well the site was modeled or designed; if the installation is not done correctly it can lead to issues with thermal treatment operations and potentially jeopardize the success of the project. Plan of Attack: When the wellfield layout has been finalized, … Continue reading