-
Recent Posts
- 2017 In Review February 7, 2018
- Temperature Monitoring Matters November 28, 2017
- Avoid Costly Off-Site Hazardous Waste Disposal with TerraTherm’s Economical On-Site Heated-Box Approach September 7, 2017
Search
Blog Categories
- Data Management (10)
- Events (3)
- FAQs (21)
- History (3)
- In Situ Thermal Remediation (65)
- Other (14)
- People (4)
- Sites/Projects (9)
- Technologies (10)
- Webinars (6)
Archives
Author Archives: Tim Miner
Moving Environmental Equipment – Logistics Done the Right Way at TerraTherm
A prodigious level of activity, intense excitement, as well as a bit of angst can precede the start of any big project. We’ve recently been experiencing all of that at TerraTherm! We reached the point in the schedule where two of our projects required the treatment equipment to be delivered almost simultaneously. Ten tractor-trailer loads of remediation equipment needed to be moved to our two, separate New England sites in the same month. All told, nearly six million dollars’ worth of equipment had to be staged, loaded, and transported to both locations in a matter of two weeks. One of … Continue reading